Fee Structure
See the fee structure as adopted by resolution. Resolution Number 6-2019 lists the application fees.
Resolution Number 6-2019
Section 2. Land Development Fees
- If additional reviews beyond the initial three are required, the applicant must submit an additional fifty (50)% of original review fee.
- Class I Improvement Review Fees:
- Residential - Single-Family Lot………………………………………………......$ 105
- Nonresidential Lot……………………………………………………………........$ 265
- Right-of-Way Reviews………………………………………………………….....$ 210
- Lot Split ………………………………………………………………………….....$ 300
- Non-residential Minor Division (max 5 lots)………………………………….....$ 525
- Class II Site Plan Review Fees:
- Site Plan Pre-Application Review, plus $10 per acre………….......................$ 265
- Site Plan Engineering Review, plus $100 per acre…………….......................$ 1,050
- Site Plan Multifamily Engineering Review, plus $10 per unit…......................$ 1,050
- Site Plan Marina Facilities, plus $10 per slip….....…………...........................$ 1,050
- Late Resubmittal Reinstatement Review Fee
Prior to 90 days from delinquent response date……………...........................$ 525
After 90 days new review fees required - Amendments to Approved Site Plans:
Minor Changes (less than 10%) …………………………................................$ 265
Major Changes (greater than 10%)……………………...................................1/2 original review fee
- Class II Subdivision Review Fees:
- Subdivision Pre-Application Review, plus $10 per acre……..........................$ 265
- Subdivision Sketch Plat Review, plus $15 per lot……………….....................$ 525
- Subdivision Preliminary Plat w/Engineering, Plus $30 per lot…….................$ 2,100
- Subdivision Final Plat, plus $20 per lot…………………………......................$ 1,050
- Small Scale Plat (maximum 10 lots)………………………..…….....................$ 1,050
- Late Resubmittal Reinstatement Review Fee
Prior to 90 days from delinquent response date……..………….....................$ 525
After 90 days new review fees required. - Amendments to Approved Site Plans:
Minor Changes (less than 10%)…..………………...........................................$ 265
Major Changes (greater than 10%)………………...........................................1/2 original review fee
- Landscape Review Fees (Class I and Class II)
- Landscape Review Subdivision, plus $10 per lot …………….…...................$ 525
- Landscape Review Non-Subdivision, plus $50 per acre …...........................$ 525
Note: All fees calculated on acres/lots are based on total acres/lots including fraction thereof.
Section 3. Site Development Permit Fees
A permit fee of all improvements required by Chapter 34, Procedures, Article IV Site Plans shall be paid to defray the cost of inspection by the City.
- Class I Site Development Permit Fees*
- Land Alterations/Clearing, plus $50 per acre.................................................$ 315
- Stormwater Improvements, plus $10 per acre...............................................$ 315
- Residential Driveway Connection, each.........................................................$ 105
- Commercial Driveway Connection, each.......................................................$ 265
- Parking Lot Restriping/Resurfacing, plus $2 per stall …..……….…..............$ 105
- Parking Lot New Construction, plus $5 per stall............................................$ 315
- ROW - Open Cuts/Directional Drill, each.......................................................$ 210
- Utility Construction,% of cost ($100 minimum)………...................................2.5
- Road Repairs, plus $50 per L.F…………………………………......................$ 105
- Sidewalks, plus $1 per L.F…………………………………..............................$ 55
- Single-Family Lot Final Inspection ………………………................................$ 105
- Trash Enclosure, each………………………………….....................................$ 210
- Utility Service Connection, each……………………….....................................$ 105
- Tree removal, plus $20 per tree ………………………....................................$55
- Class II Site Development Permit Fees
- Pre-Construction Conference ……………………………………….……..........$ 525
- Subdivision Permits,% of site construction cost*............................................2.5%
- Non-Subdivision Permits,% of site construction cost*....................................2.5%
- Class I and Class II Site Development Miscellaneous Fees
- Permit Extension Request*,% of original permit fee ($50 minimum)..............10%
- Expired Permit Reinstatement*,% of original permit fee ($ 105 minimum).....35%
- Permit Reinspections, each reinspection........................................................$ 105
- Permit Transfers*, each ………………….…………………….………..….........$ 105
- Permit Modifications*, each.............................................................................$ 375
- Work without a permit* ……………………………………….…….....................Double Permit Fee
- After Hours Inspection Fee, per hour (2 hour minimum).................................$ 75
- Land Development Closeout Review Fees
- Potable Water Clearance................................................................................$ 105
- Sanitary Sewer Clearance..............................................................................$ 105
- Reclaimed Water Clearance...........................................................................$ 105
- Stormwater Management Systems Clearance...............................................$ 105
- Utility Service Request ……………………………………………………..........$ 105
- Final Closeout and Site CO Request.............................................................$ 160
- Miscellaneous Fees
- Public Record Recording Fee, plus Brevard County filing charges................$ 55
- Flood Zone Determination/Certification, each.................................................$ 75
- Fire Hydrant Flow Test, each …………………………………………………….$170
- Force Main Pressure Test (existing tap), each ……….………………………..$150
- Force Main Pressure Test (new tap), each ………………………………….....$525.00
- Any permit not listed …………….…………………….......................................2.5% of approved site development construction cost, but not less than $100
*A surcharge shall be assessed on each permit fee in the amount of 0.3 mil per dollar valuation. The fee is to be charged on all permits regardless of type, rounded to the nearest cent including fees required under this chapter and the provisions of the Land Development Regulations. The funds generated by the surcharge shall be used exclusively for the training of department personnel and the purchase of technological tools and equipment for the department.